Folder Engineering Investigation

2018 Engineering Investigation Status

The District has received data from producers for its 2018 DRAFT Engineering Investigation Report. Staff has completed entering and performing analysis and QA/QC and produced the Report and Appendices.   All reports are shown below.

2018 Draft Engineering Investigation Report

2018 Draft Engineering Investigation Figures & Tables

 2018 Draft Engineering Investigation Report Appendices2018 Draft Engineering Investigation Report Appendices

Background

Each year since 1993, the District has produced an Engineering Investigation in accordance with Article 1, Section 75560 of the California Water Code which requires that a Water Conservation District that proposes to levy a groundwater charge "... shall annually cause to be made an engineering investigation and report upon groundwater conditions of the District". In accordance with these requirements, the San Bernardino Valley Water Conservation District must make the following findings and determinations as they relate to the ground and surface water conditions of the Bunker Hill Basin and those areas within the District boundary. 

Task 1. Annual change in storage for the Bunker Hill Basin for the preceding water year;
Task 2. Accumulated change in storage of the Bunker Hill Basin as of the last day of the preceding water year;
Task 3. Total groundwater production from the Bunker Hill Basin for the preceding water year;
Task 4. Estimate of the annual change in the Bunker Hill Basin storage for the current water year;
Task 5. Estimate of the annual change in the Bunker Hill Basin storage for the ensuing water year;
Task 6. Average annual change in Bunker Hill Basin storage for the immediate past ten water years;
Task 7. Estimated amount of agricultural water and non-agricultural water to be withdrawn from the groundwater supplies of the District for the ensuing water year;
Task 8. Estimated amount of water necessary for surface distribution for the ensuing water year for the Bunker Hill Basin and the District; and
Task 9. The amount of water that is necessary for the replenishment of the groundwater supplies of the Bunker Hill Basin and the District for the ensuing water year .

To make the findings and determinations listed above, District staff researched available hydrogeologic and engineering data for the Bunker Hill Basin. The data was compiled and analyzed and a predictive relationship between precipitation, production, and change in basin storage was determined. This relationship was based on empirical data since 1993 and enables the prediction of change in storage given certain annual production and precipitation levels. In addition, annual and accumulated change in storage values were calculated based on current and historic water level changes throughout the Bunker Hill Basin.

With the support of producers in the basin, the Report is compiled and posted for review and comment. Staff receives many comments from the Board and from basin stakeholders and incorporates these into the final version for the April Public Workshop. All basin agencies cooperate in providing groundwater production and groundwater levels. The report contains wells identified by staff and located in GIS.  The report also contains some data marked as provisional or documented assumptions, but represents the best available data and professional judgment. SBVMWD also runs their model for the basin to compare with the EI Report; historically it has coroborated the results of the EI.

Prior year Engineering Investigations reports are available below: 

 

Documents

pdf 2018 Engineering Investigation DRAFT Report (6 downloads) New Download (pdf, 631 KB)
pdf 2018 DRAFT EI Figures and Tables (5 downloads) New Download (pdf, 16.71 MB)
pdf 2018 DRAFT EI Appendices (4 downloads) New Download (pdf, 3.19 MB)
pdf 2017 Final Engineering Investigation Report (154 downloads) Popular Download (pdf, 378 KB)
pdf 2017 Final Engineering Investigation Figures & Tables (190 downloads) Popular Download (pdf, 3.94 MB)
pdf 2017 Final Engineering Investigation Appendices (119 downloads) Popular Download (pdf, 1.03 MB)
pdf 2016 Engineering Investigation Appendices (294 downloads) Popular Download (pdf, 926 KB)
pdf 2016 Engineering Investigation Figures and Tables (348 downloads) Popular Download (pdf, 17.09 MB)
pdf 2016 Engineering Investigation Report (426 downloads) Popular Download (pdf, 499 KB)
pdf 2016 Draft Engineering Investigation Report (310 downloads) Popular Download (pdf, 367 KB)
pdf 2015 Engineering Investigation Report Addendum (277 downloads) Popular Download (pdf, 1.38 MB)
pdf 2015 Engineering Investigation Report with Appendicies 3 10 15 (490 downloads) Popular Download (pdf, 3.58 MB)
pdf 2014 Engineering Investigation Report (597 downloads) Popular Download (pdf, 9.63 MB)
pdf 2013 Engineering Investigation Report (499 downloads) Popular Download (pdf, 378 KB)
pdf 2013 Engineering Investigation Report Appendices (275 downloads) Popular Download (pdf, 12.65 MB)
pdf 2012 Engineering Investigation Report (306 downloads) Popular Download (pdf, 10.83 MB)
pdf 2011 Engineering Investigation Report (331 downloads) Popular Download (pdf, 7.30 MB)
pdf 2010 Engineering Investigation Report Revised (288 downloads) Popular Download (pdf, 21.00 MB)
pdf 2009 Engineering Investigation Report Addendum (347 downloads) Popular Download (pdf, 169 KB)
pdf 2009 Engineering Investigation Report (271 downloads) Popular Download (pdf, 19.25 MB)
pdf 2008 Engineering Investigation Report (323 downloads) Popular Download (pdf, 10.19 MB)
pdf 2007 Engineering Investigation Report (437 downloads) Popular Download (pdf, 8.60 MB)
pdf 2006 Engineering Investigation Report (364 downloads) Popular Download (pdf, 12.62 MB)
pdf 2005 Engineering Investigation Report (369 downloads) Popular Download (pdf, 13.25 MB)